Photo:

Description:
All rides start and finish at the Matamata information centre.
400kms
A single loop course, with 2,831 metres of climbing. Starting in Matamata
Start time is 6am, with a time limit of 27 hours (9am 22 March finish time). Meet up outside the Hobbiton information centre.
Checkpoints are:
74 kms: Morrinsville
150kms: Te Kauwhata
281kms: Morrinsville
333kms: Paeroa
Map:

600kms
The 600km ride is split into two loops. An initial 350km loop, and a 250km loop.
Leg One, rides with the 400km riders, until the 300km mark, where the 400km riders continue on to Paeroa. At this junction, head south back to Matamata, to complete leg one.
Leg Two, is a 250km run up to Kaiaua and back.
Start time is 6am, with a time limit of 40 hours (10pm 22nd March)
Check points are:
74 kms: Morrinsville
150kms: Te Kauwhata
281kms: Morrinsville
353kms: Matamata
489kms: Kaiaua (return leg from Waharau)
603kms: Matamata (Finish)
Map:
Leg 1: 350kms

Leg 2: 250 kms
Route links:
400km rwgps link here: https://ridewithgps.com/routes/31867829
600km Leg 1 rwgps link here: https://ridewithgps.com/routes/31903675
600km Leg 2 rwgps link here: https://ridewithgps.com/routes/30894493
Ride Organiser:
Kelvin Spicer. kelvinrspicer@gmail.com. 027-368-7266